Laserfiche WebLink
• After the drainage problem is corrected, an assessment of possible <br /> damage or erosion will be conducted and all necessary repairs will be <br /> made. <br /> • If the emergency is due to a flood that is from a 100-year/24-hour storm <br /> event or less, this is an indication that the drainage and flood protection <br /> design for the facility may be inadequate. A design review shall be <br /> performed and, if appropriate, all necessary modifications to drainage and <br /> flood protection facilities will be made. <br /> 5.7 EARTHQUAKE <br /> The following procedures will be performed following an earthquake incident: <br /> • Employees driving in the field during an earthquake should stop their <br /> vehicle and get out, if it can be done in a safe manner. <br /> • After the earthquake has subsided, site personnel shall report to the site <br /> entrance gate for a roll call. If medical care is required, the procedures in <br /> Section 5.10 shall be followed. An inspection of the site shall then be <br /> made and a report given to the SSO. <br /> • Cracks observed in the final cover after an earthquake should be <br /> inspected with a combustible gas analyzer. The location of venting and <br /> the gas concentrations will be determined and reported to the SSO. <br /> Excavation and refill of the smaller surface cracks can be completed <br /> immediately. More extensive corrective actions will be authorized by the <br /> Site Engineer in accordance with the CQA Plan included in Appendix C of <br /> Appendix A. <br /> • If a slope fails due to an earthquake, a design review shall be performed <br /> for conformance with design standards established at closure and, if <br /> appropriate, all necessary modifications to the landfill's slope design will <br /> be made. <br /> 5.8 SURFACE DRAINAGE PROBLEMS <br /> In the event of a surface drainage problem, the following procedures shall be <br /> followed: <br /> • The operator will investigate the problem and determine a necessary <br /> course of action. <br /> Forward Landfill FPCPCMP 5-4 <br /> ZAPROJECTSWIIied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 5.doc:6/16/2008 <br />