My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:48:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• After the drainage problem is corrected, an assessment of possible <br /> damage or erosion will be conducted and all necessary repairs will be <br /> made. <br /> • If the emergency is due to a flood that is from a 100-year/24-hour storm <br /> event or less, this is an indication that the drainage and flood protection <br /> design for the facility may be inadequate. A design review shall be <br /> performed and, if appropriate, all necessary modifications to drainage and <br /> flood protection facilities will be made. <br /> 5.7 EARTHQUAKE <br /> The following procedures will be performed following an earthquake incident: <br /> • Employees driving in the field during an earthquake should stop their <br /> vehicle and get out, if it can be done in a safe manner. <br /> • After the earthquake has subsided, site personnel shall report to the site <br /> entrance gate for a roll call. If medical care is required, the procedures in <br /> Section 5.10 shall be followed. An inspection of the site shall then be <br /> made and a report given to the SSO. <br /> • Cracks observed in the final cover after an earthquake should be <br /> inspected with a combustible gas analyzer. The location of venting and <br /> the gas concentrations will be determined and reported to the SSO. <br /> Excavation and refill of the smaller surface cracks can be completed <br /> immediately. More extensive corrective actions will be authorized by the <br /> Site Engineer in accordance with the CQA Plan included in Appendix C of <br /> Appendix A. <br /> • If a slope fails due to an earthquake, a design review shall be performed <br /> for conformance with design standards established at closure and, if <br /> appropriate, all necessary modifications to the landfill's slope design will <br /> be made. <br /> 5.8 SURFACE DRAINAGE PROBLEMS <br /> In the event of a surface drainage problem, the following procedures shall be <br /> followed: <br /> • The operator will investigate the problem and determine a necessary <br /> course of action. <br /> Forward Landfill FPCPCMP 5-4 <br /> ZAPROJECTSWIIied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec 5.doc:6/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.