My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:49:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2003_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p. Control testing <br /> q. LCRS pipe crossing points <br /> r. Traffic control, including flagging, for construction vehicle <br /> crossing <br /> S. Grading for drainage around perimeter <br /> t. Removal and replacement of existing fence during excavation <br /> U. Maintaining and protecting the top of the clay liner surface from <br /> dessication and damage until placement of the overlying <br /> components to the liner system are placed. <br /> V. Testing of lysimeters <br /> W. Removal of sandbags, if necessary <br /> X. Unloading of geosynthetics, if necessary <br /> y. Required security fencing. <br /> 4.4 LEACHATE PIPES <br /> A. Measurement: <br /> 1. Measurement for payment for furnishing and installing the HDPE leachate <br /> collection, riser, and header pipes shall be by the linear foot of pipe <br /> installed, including all elbows, tees, wyes, caps, stainless steel clamps, or <br /> other joints, and excluding wasteage. <br /> 2. Quantities will be calculated by measurements made along the plane of <br /> installation to the dimensions shown on the Construction Drawings, or, if <br /> the Construction Drawing dimensions are modified by the OWNER, <br /> DESIGN ENGINEER or QA/QC CONSULTANT, on the basis of as-built <br /> surveys. <br /> B. Payment: <br /> 1. Payment for furnishing and installing all pipe shall be by the unit price per <br /> linear foot quoted in the Bid Form. <br /> 2. The price quoted shall include full compensation for furnishing all labor, <br /> equipment, materials, submittals, tools, accessories and incidentals, and for <br /> performing all Work specified including, but not limited to, installing, <br /> perforating, retrofitting, seaming, repairing, protection, and all QA/QC <br /> documentation required to complete the Work in accordance with Section <br /> 02535, LEACHATE PIPES, of these Specifications and the Construction <br /> Drawings, and as directed by the QA/QC CONSULTANT. <br /> FORWARD LANDFILL 01200 <br /> 7 PRICE AND PAYMENT PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.