17ECTOR <br /> ENGINEERINQ INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 98 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. January 22, 2004 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San eeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Jay Wellen and Curtis D. Ayre Khounmouang Montie C. Vector <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native stockpiled clay Cold, foggy and calm(AM), Cool, Ken Davila <br /> sunny and breezy P <br /> Equipment on site: <br /> 1-D6 dozer, 1-9661oader, 1-138 dozer, 1-330 excavator,2-D250 haul trucks 1-LGP D6 dozer, 1-TH103 extendalift loader <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn construction continued placing granular drainage material(GDM)along the north"V"ditch of the <br /> FU-03 cell working west to east,until completion in the late afternoon. Gravel was placed on the pipes in <br /> the same ditch prior to GDM. Prior to placing the eight-ounce(8 oz) geotextile,the thickness of the <br /> drainage rock was checked with the measuring rod and also placed using a GPS system attached to the <br /> dozers. Operations layer was placed in the northeast quadrant of the cell floor,working west to east and up <br /> the west slope working south to north. The operations layer material was taken from the on site stockpile. <br /> The west"V"ditch geotextile was cut open, regraded and left until the surveyor of record checked the area. <br /> Work continued in the leachate pond removing the gravel and pumping the water out and in the mid <br /> afternoon,the sump pipe was removed. After reviewing the plans and looking at the leachate sump pipe,it <br /> was discovered that there were two different sets of plans which showed different pipe locations. After site <br /> discussions and phone calls,the pipe will be relocated to the south and the pipe trench widened. <br /> The GSE foreman and a crew of three(3)arrived on site and began repairs on the cell floor and in the <br /> west"V"ditch. When the repairs were completed,the crew began deploying geosynthetic clay liner(GCL) <br /> in the cell sump. Fifteen(15)panels were deployed throughout the afternoon. Four panels of 60 mil HDPE <br /> were also deployed along the sump southern edge at the toe of slope in the late afternoon. <br /> The Vector project manager,Montie C.,was briefly on site to transport three(3)bucket samples to the <br /> laboratory for constant head testing. At his request and prior to liner repairs,two(2)moisture samples were <br /> taken from the northeast quadrant at the"V"ditch where,previously, water had been trapped under the liner <br /> and was later allowed to drain. The samples were placed in the oven for overnight drying. <br /> Quartaroli Surveying was on site to check the grade of the west"V"ditch from the sump approximately <br /> twenty feet to the northwest. He stated that it contained both proper"fall"and clay liner thickness. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />