Laserfiche WebLink
"U.-YUr"'TOR <br /> ENGINEERING INC <br /> DAILY CONSTRUCTION FIELD REPOR <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 99 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. January 23,2004 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Jay Wellen and Curtis D. Are KhounmouanLocklin Cafe Allied <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native stockpiled clay Cold, fo gy and calm to breezyKen Davila <br /> Equipment on site: <br /> 1-136 dozer, 1-966 loader, 1-D8 dozer, 1-330 excavator,2-D250 haul trucks, 1-LGP D6 dozer1-TH103 extendalift loader <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn construction continued placing operations layer in the northeast quadrant of the cell floor,working <br /> west to east and up the south slope working west to east. The operations layer material was taken from the <br /> on site stockpile. The west"V"ditch repair work was completed,geotextile placed and the pipe left to be <br /> placed on Monday. Minor work continued in the leachate pond cleaning the sump rock out. The leachate <br /> pond pipe will not be relocated as of today. The Guinn foreman stated that work on the leachate pond woul� <br /> continue on Monday and that they would be leaving site at 1:00 pm. <br /> GSE continued deploying 60 mil HDPE in the cell sump and extrusion welded all seams. The sump floor <br /> was black by lunch break. Lystering and welding continued in the afternoon. Seven(7)panels were <br /> deployed and seamed throughout the day. <br /> Lochlin C. was on site in the morning to discuss project progress and work scheduling. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-,) <br />