Laserfiche WebLink
17E TOR <br /> ENGINEERING INC. <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 100 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,Ca Butch Stefan Forward, Inc. January 26, 2004 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Curtis Donahue Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native stockpiled clay Cold, fog and calm to breezy Ken Davila <br /> Equipment on site: <br /> 1-D6 dozer, 1-966 loader,2-D250 haul trucks, 1-LGP D6 dozer, 1-TH103 extendalift loader, 1-14G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn construction continued placing operations layer on the north bench at the 2:1/5:1 slope <br /> intersection, working east to west in the morning and west to east in the afternoon. The operations layer <br /> material was taken from the on site stockpile. Minor work continued in the leachate pond cleaning the sump <br /> rock out and placing the gravel log along the south and west perimeters. In the afternoon,the leachate pond <br /> ladders were placed in the north, west and south slopes and the anchor trenches backfilled. The southeast <br /> comer of the pond remains open for work on the pipe relocation. <br /> GSE completed the extrusion welding on the remaining seams around the cell sump in the morning. One <br /> (1)panel of GCL and one panel of 60 mil HDPE were deployed and seamed on the south cell slope over the <br /> sump pipe. The double layer of geotextile began to be deployed in the cell sump in the late afternoon and by <br /> early evening was completed. <br /> The last of the samples of granular drainage material was obtained for a sieve analysis and constant head <br /> perm. <br /> A brief meeting was held at the end of the day with Curtis,Ayre and I to discuss the work schedule for <br /> tomorrow, depending on site weather conditions. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r.? <br />