Laserfiche WebLink
17ECTOR <br /> ENGINEERING INC. <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 102 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, Ca Butch Stefan Forward, Inc. Jan 28,2004 Wednesda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE San Beta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Jay Wellen Ayre Khounmouan9 Lochlin C.,Kirt F. Allied <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native stockpiled clay Cold, overcast and windy Ken Davila <br /> Equipment on site: <br /> 1-D6 dozer, 1-966 loader,2-D250 haul trucks, 1-LGP D6 dozer, 1-TH103 extendalift loader, 1-140Gblade, 1-330 excavator, I- <br /> 290LC-3 long reach excavator, 6 bellX dumE trucks <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Construction began hauling and placing granular drainage material and operations layer in the early <br /> morning. These materials were placed onto the southwest corner and in the sump to complete the FU-03 <br /> cell floor. The operations layer material was taken from the on site stockpile. After GSE cut open the <br /> secondary liner and GCL in the leachate pond sump,the long reach excavator began to cut the sump into <br /> dimensions of approximately 30'x 11'. In the early afternoon, the lysimeters were installed but technical <br /> difficulties with the south one delayed deployment until tomorrow. In the evening,the lysimeter was <br /> repaired,tested and backfilled,to the delight of all on site personnel. All of the leachate pond ladders have <br /> been placed in the leachate pond and the anchor trenches will be backfilled after completion of the geonet <br /> and primary liner deployment. They also utilized the 330 excavator to begin to uncover the eastern <br /> termination berm from north to south so the east half of the cell could be leak tested. <br /> GSE continued the extrusion welding of the flap over the gravel log along the north and east floor <br /> throughout the day. <br /> Leak Location Services, Inc. personnel were on site and began to set the lay out for their testing grid and <br /> proceeded to test the northwest quadrant. <br /> The granular drainage material sampled yesterday was tested for sieve analysis and was within <br /> specification. The on site foreman was present during testing and saw the passing results. This completed <br /> the on site soils testing for the FU-03 cell. The remainder of the sample will be transported to the Vector <br /> laboratory for constant head permeability testing. <br /> Lochlin and Kirt were on site to observe the leak detection process and to discuss project progress. <br /> repared By: Reviewed By: <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-9 <br />