My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TZECTOR <br /> ENGINEERING INC. <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 021605.03 103 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca Ca Butch Stefan Forward, Inc. Jami2a 292004 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Construction GSE SanBeta Lewis <br /> General Foreman: Liner Superintendent: Others: <br /> Jay Wellen Are Khounmouan <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native stockpiled clay Cool,partly cloudy and breezy Ken Davila <br /> Equipment on site: <br /> 1-D6 dozer, 1-966 loader,2-D250 haul trucks, 1-LGP D6 dozer, 1-TH103 extendalift loader, 1-140G blade, 1-330 excavator, 1- <br /> 290LC-3 long reach excavator <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Construction continued placing operations layer on the top of the 5:1 slope. The operations layer <br /> material was taken from the on site stockpile. In the afternoon,they began to place the sump pipe in the <br /> leachate pond but the weld broke. In the early evening,the welding machine was returned to the site and the <br /> pipe and gravel were then placed. The eastern termination edge of the cell floor continued to be uncovered <br /> using the 330 excavator. 0 <br /> GSE began the day deploying the GCL which had been pulled back and completed the extrusion welding <br /> of the leachate pond sump secondary liner. By late morning they had deployed the cushion geotextile in the <br /> sump and because of the pipe delay and therefore could not deploy liner, cleaned up scrap material and <br /> cleaned the water and rocks out in preparation for tomorrow's deployment. <br /> Leak Location Services,Inc. personnel arrived on site and continued testing of the cell floor in the <br /> northern half. <br /> Report preparation began with the compilation of all on site field data sheets and documentation. <br /> Prepared By: Reviewed By: is <br /> 4/23/03,Rev. 0 1 of 1 <br /> r-*7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.