My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU -03, WMU F -West Leachate Impoundment and Desilting Basin February 2004 <br />Forward Landfill Job No. 021605.03 <br />0 • Field Panel identification <br />Prior to GCL deployment, Vector's CQA Monitor and GSE (liner contractor) discussed <br />and agreed to the identification code for each panel deployed. During the deployment, <br />Vector's CQA Monitor verified that the subcontractor marked the deployed panels and <br />that each panel placed was marked with the manufacturer's roll number. <br />® Field Panel Placement <br />During the panel placement, Vector's CQA Monitor kept panel deployment logs. These <br />logs recorded the location (panel number and roll number), installation schedule (date <br />and time), weather conditions (temperature and wind), and GCL type. To protect the <br />GCL, HDPE liner was deployed concurrently with the GCL placement. The GCL panel <br />deployment logs are presented within Appendix H. <br />During placement of the GCL, it was observed that the slope lengths in some areas <br />exceeded the 150 -foot roll lengths delivered to site. Per the specifications, no <br />Ol horizontal seams of the GCL were allowed. Therefore, the Contractor had longer rolls <br />delivered to the site that would cover the approximate 200 -feet long slope. <br />5.2.3.2 Defects and Repairs <br />Vector's CQA Monitor inspected all seams and non -seam areas of the GCL for defects, <br />holes, displaced panels, premature hydration, and signs of contamination by foreign <br />material. <br />Vector's CQA Monitor recorded defects as part of the daily construction report. <br />Appropriate repairs were completed prior to installation of the overlying HDPE material. <br />5.3 Geomembrane <br />5.3.1 Geomembrane Material <br />A 60 -mil thick high-density polyethylene (HDPE) geomembrane manufactured by GSE <br />was used in the liner system for WMU FU -03 and WMU F -West Leachate <br />Impoundment. <br />Vector Engineering, Inc. - 143E Spring Hill Drive - Grass Valley, CA 95945 - (530) 272-2448 <br />-21- <br />
The URL can be used to link to this page
Your browser does not support the video tag.