My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-03,WMU F-West Leachate Impoundment and Desilting Basin February 2004 <br /> Forward Landfill Job No.021605.03 <br /> ® Weather Conditions for Seaming <br /> Vector's CQA Monitor verified and documented that the weather conditions for seaming <br /> were within the project specifications and manufacturer's guidelines. <br /> Trial Seams <br /> Prior to seaming activities at the beginning of each day, and at a minimum once during <br /> the middle of the shift, a trial seam (start-up trial weld)was prepared for each of the <br /> wedge and extrusion welders used for that shift. The seaming technicians prepared a <br /> test specimen and marked the sample with the machine number, machine temperature, <br /> date, time, and operator name. <br /> The shear and peel tests were performed in the field in accordance with ASTM D-6392. <br /> If the start-up weld sample failed to meet the project specifications, the welding <br /> technician and supervisor were notified and advised to take corrective action or put that <br /> machine out of service. The CQA monitor document the trial welds, which included the <br /> date, time, temperature, machine number, technician, and results of the shear and peel <br /> testing. The geomembrane start-up trial weld logs are presented within Appendix I. <br /> • Non-Destructive Seam Continuity Testing <br /> After seaming of the panels was completed, the Contractor's QC technician and <br /> Vector's CQA Monitor inspected the seams and panels for defects. The QC technician <br /> marked defective seams or tears, holes, non-dispersed resin beads or other defects for <br /> repair. The air pressure test method was used for double wedge-welded seams and <br /> the vacuum box for extruded seams for seam continuity testing. Vector's CQA Monitor <br /> observed the non-destructive seam continuity testing and repairs performed by GSE to <br /> ensure that the seams were satisfactory. The air pressure test logs for the wedge- <br /> welded seams are presented in the seaming log in Appendix I. <br /> Vector Engineering, Inc. - 143E Spring Hill Drive- Grass Valley, CA 95945-(530)272-2448 <br /> -27- <br />
The URL can be used to link to this page
Your browser does not support the video tag.