My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:41:44 AM
Creation date
7/3/2020 10:49:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-03,WMU F-West Leachate Impoundment and Desilting Basin February 2004 <br /> Forward Landfill Job No.021605.03 <br /> survey conducted after the operations layer was placed. A complete report of the <br /> procedure and findings of the leak location surveys are included in Appendix J. <br /> 5.4 Geotextile <br /> 5.4.1 General <br /> An 8-oz/yd2 geotextile was used as a separation layer between the LCRS granular <br /> drainage material and the operations layer. A 12-oz/yd2 geotextile was used as a <br /> cushion layer on the floor to the module between the geomembrane and LCRS granular <br /> drainage material. A 16-oz/yd2 geotextile was used in the LCRS trenches to <br /> encapsulate the gravel fill and HDPE piping. <br /> 5.4.2 Receiving Inspection <br /> Upon arrival by truck shipment, Vector's CQA Monitor observed the unloading and <br /> storage of the geotextile rolls. Each roll of geotextile was logged in by roll number and <br /> was crosschecked against the quality control documents provided by the Contractor <br /> submittal. Following inspection and approval the material was approved for installation. <br /> A copy of the log of geotextile received and manufacturer's QC data are included in <br /> Appendix K. <br /> 5.4.3 Deployment <br /> The panel deployment procedure was observed and documented by Vector's CQA <br /> Monitor. Our CQA Monitor verified that the conditions of the CQA manual were met <br /> during deployment. Vector's CQA monitor observed that proper seam overlap, <br /> seaming, tie-ins, and other manufacturer's written guidelines were followed. <br /> 5.4.4 Repair <br /> The geotextile materials were checked for defects during deployment and holes or tears <br /> were identified and repaired prior to placement of the cover materials. <br /> 5.5 Geocomposite and Geonet <br /> 5.5.1 General <br /> Vector Engineering, Inc. • 143E Spring Hill Drive •Grass Valley, CA 95945 •(530)272-2448 <br /> -30- <br />
The URL can be used to link to this page
Your browser does not support the video tag.