LFG CONTROL CORPORATION <br />to <br />REPORT NO: 4 <br />DATE: 5/29/2009 <br />WEATHER: Clear/ Windy <br />PROJECT: Forward Landfill 2009 Gas System Improvements <br />CLIENT: Allied Waste <br />CONTRACTOR: American Environmental Group <br />CONTRACTOR PERSONNEL: 10 <br />EQUIPMENT ON SITE: Excavator, Drill Rig, Track Loader, 3 OHV's, 4 Pickup Trucks, <br />3 Equipment Trailers, Fusion Machines, Backhoe <br />MATERIAL RECEIVED: 50 TN Gravel <br />VISITORS: Natalia S., Environmental Health, John Geels, & Ruben Ramirez <br />6" PIPE DIA. <br />4" <br />PIPE DIA. <br />PIPE DIA. <br />210' TRENCHED <br />106' <br />TRENCHED <br />TRENCHED <br />220' PIPE INSTALLED <br />90' <br />PIPE INSTALLED <br />PIPE INSTALLED <br />VALVE(S) or TEE(S) <br />1 <br />TEE(S) <br />VALVE(S) or TEE(S) <br />CONSTRUCTION ACTIVITIES <br />Continued to install 6" header pipe below grade. Total 6" header to date: 720' installed, 730' trenched, <br />& backfilled to 700'. Header 6" depth reached 10' 2 5+10 prox. Deep trench depth ended @ 5+80. <br />Trenched 106', installed 90' of 4" lateral for EW FU06-15. Continued to import (onsite) trench backfill <br />throughout day and offhaul trench spoils. Placed 2" pipe risers for as built survey. Plastic locator <br />tape installed in all trenches to date as per plans. Drill crew started drilling EW FU06-15 @ 11:00 A.M. <br />and completed installation at 2:45 P.M. Drilled bore to depth of 66', installed 40' of perforated and 26' <br />of solid 6" well casing. Gravel was placed to 23' below GR and EW was backfilled as per plans. <br />Pipe crew worked from 6:00 A.M. to 8:00 P.M. <br />By <br />Loren Rush <br />Resident Project Representative <br />