LFG CONTROL CORPORATION <br />Wei <br />REPORT NO: 5 <br />DATE: 5/30/2009 <br />WEATHER: Pt. Cloudy / Warm <br />PROJECT: Forward Landfill 2009 Gas System Improvements <br />CLIENT: Allied Waste <br />CONTRACTOR: American Environmental Group <br />CONTRACTOR PERSONNEL: 10 <br />EQUIPMENT ON SITE: Excavator, Drill Rig, Track Loader, 3 OHV's, 4 Pickup Trucks, <br />3 Equipment Trailers, Fusion Machines, Backhoe, Dozer <br />MATERIAL RECEIVED: None <br />VISITORS: None <br />6" <br />PIPE DIA. <br />4" PIPE DIA. <br />PIPE DIA. <br />362' <br />TRENCHED <br />85' TRENCHED <br />TRENCHED <br />372' <br />PIPE INSTALLED <br />30' PIPE INSTALLED <br />PIPE INSTALLED <br />1 <br />VALVE(S) or TEE(S) <br />VALVE(S) or TEE(S) <br />VALVE(S) or TEE(S) <br />CONSTRUCTION ACTIVITIES <br />Continued to install 6" header pipe below grade. Total 6" header to date: 1092'. Installed 6" X 4" TEE <br />for EW FU08-02 lateral. Installed 45 deg. Elbow @ EW FU08-02 for riser alignment. Installed 75' and <br />trenched 85' for 4" lateral@ EW FU08-02. Installed 28' and riser of 4" lateral 9, FU08-01. Installed 40' <br />of 8" CSP @road crossing. 90 deg. Elbow was installed 6" header station 9+00. Installed EW <br />FU06-15 riser and additional 30' of 4" lateral. Backfilled total length of trench of 6" header and placed <br />cover @ end of header. Drilled FU08-02 to 52' de th and placed 20' solid and 32' perforated casing. <br />Drilled FU08-16 to 66' de th and elaced 26' solid and 40' perforated casing. Drilled FU08-03 to depth of <br />63' and installed 23' soild and 36' erforated casing. Note: EW FU08-03 was staked @ 92.8' El. a 4.8' <br />difference from plans. All three EW's were covered with temp. cover and not backfilled due to no <br />Environmental Health Inspector present. Drillers worked 7:00 A.M. until 3:30 P.M. Pipe crew worked <br />16:00 A.M. until 7:30 P.M. prox. <br />By <br />Loren Rush <br />Resident Project Representative <br />