Laserfiche WebLink
Stage 1A Partial Final Closure February 2006 <br /> Forward Landfill Project No.021605.06 <br /> ® 5.4 Geocomposite <br /> A geocomposite drainage layer was placed as part of the seep collector for the <br /> side-slopes of the Stage lA closure. The geocomposite consists of a non-woven <br /> geotextile fused on one side of the HDPE geonet. The remaining geocomposite <br /> supplied for construction of the side-slopes of WMU FU-05 was also used for <br /> the seep collectors. This geocomposite was previously approved and satisfied <br /> the project specifications for use in the Stage lA closure. Documentation on <br /> the geocomposite is included in the FU-05 CQA Report. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -17- <br />