17E TOR <br /> ENGINEERING,INC. <br /> L P <br /> DAILY CONST FIELD ORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 46 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste July 18, 2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), mid 70's to mid 100's Mike Strobel <br /> Equipment on site: <br /> 4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued finish grading of the floor subgrade in FU-06; paddle wheel scraper and blade using GPS, <br /> followed by moisture conditioning and the smooth drum roller. <br /> 2. Continued excavation of the lateral drainages to the sump in the lower floor area subgrade of FU-06; <br /> cut trench for LCRS riser pipes. <br /> ® 3. GSE representative Ruben Altamirano on site: off-loads 2 deliveries, 30 rolls total, of textured 60-mil <br /> HDPE. <br /> II. Testing <br /> 1. Performed 8 FDT's in compacted Subgrade in the west floor area, tests SG-77 through SG-83; all tests <br /> passed. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: &f�- I <br /> I of 1 4/23/03,Rev.0 <br />