Laserfiche WebLink
TOR <br /> ENGINEERING, INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 80 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 30, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (N ), high 50's to low 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE continued deployment of 60-mil HDPE single side textured on the 5:1 slope area, liner panels P-40 <br /> through P-49: area= 65,142 square feet. Total coverage to date= 156,800 square feet. <br /> 2. GSE removed 17 rolls of Geocomposite on the south slope and within the sump: area=49,089 square feet. <br /> 11. Testing <br /> Monitored activities; all logs, as-built etc. <br /> Located 60-mil HDPE Destructive Samples DS-6 through DS-14. Tested samples DS-6, 7 and 8 with <br /> passing results. Samples 9 through 14 will be tested tomorrow. <br /> III. Conversations <br /> • None listed. <br /> Prepared By. Reviewed By: Arz <br /> 1 of 1 4/23/03,Rev.0 <br />