Laserfiche WebLink
T/T TOR <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 94 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 16, 2006 Saturday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear,breezy (NNW), low 50's to mid 70's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE completed deployment of 12 oz. Geotextile Cushion over HDPE in module FU-06. 12 oz. Geotextile <br /> deployed today= 121,569 square feet. Total 12 oz. geotextile deployed to date=381,175 square feet. <br /> 2. GSE extends the Geocomposite at the toe of the 5:1 slope into the LCRS ditch. <br /> II Testing <br /> Monitored activities. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />