VE TOR <br /> ENGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 95 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 18, 2006 Monday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Scat. clouds, It. breeze (NW), mid 50's to high 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE completed minor detail work on the Cushion Geotextile across the floor area, deploying about 9,000 <br /> square feet of material. Total 12 oz. Geotextile to date= 390,175 square feet. <br /> 2. Gwinn Construction started placement of the V thick lift of LCRS Granular Drainage material in the NEC <br /> of the floor. A loader placed the initial gravel for access by the D6 dozer. Gwinn then set the portable <br /> conveyor to off-load gravel trucks and get the gravel onto the floor for the D6. <br /> 11. Testing <br /> 1. Monitored activities. Continued data entry on the Repair Logs. <br /> 2. Collected Granular Drainage Material "Fine Gravel" sample FG-3 for conformance tests. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., Re: Discussed design of the temporary berm in the <br /> SEC on the floor. Gwinn will start the berm tomorrow. <br /> Prepared B Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />