My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_23
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_23
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_23.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
762
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LY TOR <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 96 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 19, 2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Scat. clouds, It. breeze (NW),high 50's to high 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn continued placement of the 1' thick lift of LCRS Granular Drainage material on the east floor area. <br /> 2. Gwinn starts and completes construction of the temporary berm in the SEC floor area. <br /> 3. GSE started and completed deployment of Bentofix and 60-mil HDPE sst liner on the temporary berm in <br /> the SEC of the floor area. <br /> 4. Gwinn deploys 8 oz. Filter Geotextile and started placement of the Operations Layer over geotextile in the <br /> ® NEC of the floor area. <br /> II. Testing <br /> 1. Monitored activities. Completed data entry on the Repair Logs. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., Re: Discussed design of the temporary berm in the <br /> SEC on the floor with the design engineer Sangeeta Lewis. Clarified location of Bentofix to be <br /> between the floor HDPE and the HDPE on the berm. Also, as designed, there will be a containment <br /> between the berm and the south slope; suggested grading soil within this area to drain to the east. <br /> Ms. Lewis said that the design modification will be O.K. <br /> Prepared By Reviewed By: <br /> 1 of 1 4/23/03,Rev. 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.