Laserfiche WebLink
17E <br /> ENGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 104 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 29, 2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (N ), low 50's to low 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn placed Granular Drainage material over Boz. Filter Geotextile in the sump. <br /> II. Testing <br /> 1. Monitored activities. <br /> 2. Completed data entry on all Geosynthetics in WMU FU-06. <br /> OConversations <br /> • With Monte Christie, Vector Engineering, Inc., Re: Status. Monte will make a site visit next week. <br /> Prepared Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />