LY <br /> T <br /> ENGINEERING,INC. <br /> ® DAILY C ONS TRUC TION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 106 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste October 3,2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (N ), low 50's to mid 70's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Completed installation of the perforated LCRS. pipe in the northwest area; Coarse Gravel placed over <br /> Cushion Geotextile for pipe bedding, followed by the pipe and 1' of Coarse Gravel, all wrapped in <br /> Cushion Geotextile. <br /> 2. Gwinn continued placement of the Granular Drainage Material over Cushion Geotextile down the west <br /> area. Filter geotextile is deployed over the drainage material followed by placement of the Operations <br /> ® Layer soils. Working out of the NWC/tie-in this p. . <br /> II. Testing <br /> 1. Monitored activities. <br /> 2. Continued data entry. <br /> 3. Completed review of the Repair Log and HDPE liner As-built map. <br /> 4. Collected Granular Drainage Material "Fine Gravel" sample FG-5 for conformance tests. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., Re: Gwinn will be done in the FU-06 floor area <br /> probably by tomorrow. Monte will make site visit tomorrow. <br /> 41 <br /> Prepared y: Reviewed By: <br /> 1 of 1 4/23/03, Rev. 0 <br />