Laserfiche WebLink
17E 'TOR <br /> ENGINEERING,INC <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 112 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste October 11, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, breeze (SE), low 50's to mid 70's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 1 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn places concrete grout in anchor trench slopes at the ease limit of FU-06. <br /> 2. Gwinn continued placement of LCRS Granular Drainage Material along the west side of FU-06 tie-in to <br /> FU-05. <br /> 3. Gwinn adds LCRS gravels over plywood along the east termination of FU-06. <br /> 4. Gwinn extends the east berm in the SEC of the Northern Portion of FU-06. <br /> Westing <br /> 1. Monitored activities. <br /> 2. Continued work on the Final Report. <br /> ll1. Conversations <br /> • Left a message with Jerry Slinkard with GSE requesting inventories on the Geo-grid delivered to <br /> site. <br /> Prepared By. Reviewed By: <br /> 1 of 1 4/23/03,Rev. 0 <br />