IV VW7 <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 116 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste October 17, 2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, breeze (SE), low 50's to low 70's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 1 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE completed deployment of 60 mil double side textured HDPE across the crest of the 5:1 slope. Panels <br /> P-148 through P-161; area = 17,128 ft2. Total area here = 57, 872 ft2. Total HDPE liner deployed this <br /> project= 650,253 ft2. (Vector measurements). <br /> 2. Gwinn continued construction of the east termination berm in the Southern Portion floor area. <br /> esting <br /> Monitored all activities during liner deployment. <br /> 2. Located, removed and tested HDPE liner Destructive Samples DS-60 through DS-64: all passed. <br /> III. Conversations <br /> • With Ms. Sangeeta Lewis, Lewis Engineering, Re: Design Modification regarding substitution of <br /> Cushion and Filter geosynthetics atop the 5:1 slope is not required; construction and installation of <br /> liner components will be " ...according to the Specifications." <br /> • With Lochlin Caffey, Allied Waste, Re: Site visit. Observe deployment of HDPE liner. Discuss <br /> installation of"rain flap" at the west end of the crest of the 5:1 slope. <br /> Prepared By: Reviewed By: <br /> I of 1 4/23/03, Rev. 0 <br />