Laserfiche WebLink
ENGINEERING, INC. <br />DAILY CONSTRUCTION FIELD I, <br />Project Name: <br />Project No. <br />ReportSequence <br />Forward WMU FU -06 <br />02.1605.07 <br />25 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 16, 2006 <br />Friday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Import <br />Clear, It. breeze (NW), high 50's to low 90's <br />Mike Strobel <br />Equipment on site: I <br />3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. No activity in the south area of FU -06. <br />2. The D6 reshapes the existing mid -slope perimeter ditch at the north end of FU -06 <br />II. Testing <br />1. None. <br />0II. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: Aft <br />1 of 1 4/23/03, Rev. 0 <br />