VNGINEERING, INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />47 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />July 19, 2006 <br />Wednesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native soils <br />Mostly cloudy, It. breeze (NW), low 70's to low100's <br />Mike Strobel <br />Equipment on site: <br />4x637 scra ers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe, forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued -finished grading the floor subgrade in FU -06. <br />2. Start -finished excavation of the anchor trench across the south limit of FU -06. <br />3. GSE starts filling sand bags. <br />4. Ten rolls of Bentofix arrived this morning. The material was off-loaded using a forklift. <br />5. A tractor and disc arrived today for clay work. <br />0 I. Testing <br />1. Performed 9 FDT's in compacted Subgrade in the floor area, tests SG -84 through SG -93, all passed. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: A(,( <br />1 of 1 4/23/03, Rev. 0 <br />