Laserfiche WebLink
AU V. uv .4vvu 1%;i l <br />fiiu r. uu4 <br />vECTOR <br />rn�GINEERIIVG; INC: <br />1. C'.unstructicm <br />I . Surveyors shoot the floor subgradc in FU -06. <br />2. Finished excavation orthe anchor trench across the south litni,t of FU -06. <br />3. USE, continued tilling sand bags and off-loading deliveries of geosynthetics. <br />Delivery summary: Truck load #1, 7/18/06 w/15 rolls SST 60-rni 1. <br />Truck load #2, 7/18/06 w/15 rolls SST 60 -mit. <br />Truck load #3, 7/19/06 w/10 rolls Bentofix and 20 hags ol'bentonitc. <br />Truck load #4, 7/20/06 w/15 rolIs SST 60 -mil. <br />Truck load 45, 7/20/06 w/l 1 rolls DST 60 -mil. <br />Truckload W6, 7/20/06 w/10 rolls Bentofix and 20 bags ol'bentonite. <br />4. A tractor and disc arrived today for clay work. <br />I1. Testing <br />1. Collected 3 samples of the LCRS Granular Drainage material placed atop FI! -06 for laboratory <br />conformance testing: Sample #2, NEarca.; sample #3, SI : area; sample 44, SW Circa. The sampies were <br />expedited to Vector Engineering, inc. by field lab. assistant Tom Brady, <br />11i. Conversations <br />• Attended e,onstruction Meeting: discussed schedule.. <br />• Expect about 3 days to do liner on berms in the FIJ-06 upper arca. <br />• Expect to start placement of clay liner next Monday. <br />• Monte Christie w/Vcctor has provided a punch list for the completion of the. FU -06 upped arca. <br />• Vector to coordinate with Gwinn during leak testing of the lifter in the lower area of Ft J-06, <br />• Vector to contact 13entoftx to get certifications; all I IDPH liner on site leas certifications included <br />with the delivery inventories. <br />. - .... <br />repdred R lieviewed By; 1 <br />I of 1 4/23/03, Rev. 0 <br />