My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009_26
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2009_26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 10:55:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009_26
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2009_26.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T/T C"TOR <br />ENGINEERING INC <br />r <br />DAILYOâ–º' <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />007 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />11 Aug 09 <br />Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />N/A <br />06:00 am to 14:30 pm <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill <br />Surety, 90's <br />I <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS -Equipped (1); CAT 637 Scrapers (3); CAT TL943 Forklift (1); CAT 143H Grader (1); Water Truck 1) <br />Contractor morning meeting: <br />N/A <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />EARTHWORKS <br />Guinn welded together sections of the 3" HDPE perforated pipe and solid pipe. They placed the solid pipe in the <br />trenches they had excavated last week in the north berm and backfilled the berm over the pipes, leaving the outside <br />ends exposed. <br />O <br />LINER <br />Guinn Construction and Allied Waste laborers continued placing geogrid in the designated geogrid area in the <br />southwest section of FU -08, Upper Portion. They used new geogrid that Allied purchased yesterday. Vector <br />confirmed that the geogrid used was Tensar Corporation Product Code UX140070, which conforms with the project <br />specifications. The remainder of the geogrid area was covered today. <br />The CAT 143H Grader, CAT CS54 Smooth Drum Compactor, and CAT 420D Combination Loader were used to <br />assist in placement of the geogrid. The Grader and Combination Loader were used to backfill the outer anchor trench <br />once the geogrid rolls were in place. The Smooth Drum roller and Grader were used to smooth out the subgrade ahead <br />of the geogrid placement. <br />Prepared By: Steven Rosbach Title: Senior Engineering Technician Date: 08/11/09 <br />Reviewed By: Title: Date: <br />0 <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.