Laserfiche WebLink
Y7ECTOR <br />ENGINEERING INC. <br />0 D41L Y CONSTRUCTION' • <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />008 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />12 Au 09 <br />Wednesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />N/A <br />06:00 am to 14:30 pm <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill I <br />sunny, 90's <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS-Eauintned (1): CAT 637 Scrapers (3). CAT TL943 Forklift (1); CAT 143H Grader (1); Water Truck (1) <br />Contractor morning meeting: <br />N/A <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Guinn welded together sections of the 3" HDPE perforated pipe and solid pipe. They placed geotextile down the <br />northernmost trench and welded the 3" perforated pipe to the 3" solid pipe that they placed yesterday. Once the pipe <br />,amayaS <br />in place along the entire length of the trench, Guinn placed some Drainage Gravel in the trench, just enough to <br />eight the textile down. They used to CAT front-end loader to do this. <br />The CAT smooth -drum compactor rolled the northern slopes and floors continuously throughout the day, and the water <br />truck kept dust down by moisture conditioning the soil throughout the day. <br />N/A <br />Prepared By: Steven Rosbach Title: Senior Engineering Technician Date: 08/12/09 <br />Reviewed By: Title: Date: <br />0 <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />