Final Construction Quality Assurance Report—WMU FU-13 <br /> Forward Landfill <br /> 2.0 PROJECT DESCRIPTION • <br /> 2.1 PROJECT COMPONENTS—WMU FU-13 <br /> WMU FU-13 encompasses approximately 10.2 acres, which includes approximately 6.1 acres of <br /> side-slope and 4.1 acres of floor. WMU FU-13 ties into the southern side of the existing FU-08 <br /> (northern portion) and the eastern portion of the existing WMU FU-10. The composite liner <br /> components from WMU FU-08, FU-10, and FU-13 were joined together to provide a continuous <br /> composite liner system. This system, installed within the WMU FU-13 project area, consists of <br /> the following (from top to bottom): <br /> FLOOR BOTTOM <br /> • 1-foot thick protective operations layer soils; <br /> • >7 oz/yd2 filter geotextile; <br /> • 1-foot thick granular drainage layer overlapping LCRS trenches with HDPE pipe and coarse <br /> gravel encapsulated in 7-oz/yd2 filter geotextile; <br /> • >12 oz/yd2 cushion geotextile; <br /> • 60-mil thick double-side textured HDPE geomembrane; <br /> • 2-foot thick low permeability clay liner; and • <br /> • Prepared subgrade fill soils. <br /> 2:1/4:1 SIDESLOPES <br /> • 1-foot thick protective operations layer soils (to be placed 10 feet vertically up the slope, <br /> the remaining material will be placed during operations); <br /> • Geocomposite drainage material; <br /> • 60-mil thick single-side textured HDPE geomembrane; <br /> • Geosynthetic clay liner (GCL); and <br /> • Prepared subgrade fill soils. <br /> TOP DECK AREA <br /> • 1-foot thick protective operations layer soils; <br /> • >7 oz/yd2 filter geotextile; <br /> • 6 inches of granular drainage material; <br /> • >12 oz/yd2 cushion geotextile; is <br /> 2 Geo-Logic <br /> A S S 0 C I A T E 5 <br />