My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Construction Quality Assurance Report—WMU FU-13 <br /> Forward Landfill <br /> 2.0 PROJECT DESCRIPTION • <br /> 2.1 PROJECT COMPONENTS—WMU FU-13 <br /> WMU FU-13 encompasses approximately 10.2 acres, which includes approximately 6.1 acres of <br /> side-slope and 4.1 acres of floor. WMU FU-13 ties into the southern side of the existing FU-08 <br /> (northern portion) and the eastern portion of the existing WMU FU-10. The composite liner <br /> components from WMU FU-08, FU-10, and FU-13 were joined together to provide a continuous <br /> composite liner system. This system, installed within the WMU FU-13 project area, consists of <br /> the following (from top to bottom): <br /> FLOOR BOTTOM <br /> • 1-foot thick protective operations layer soils; <br /> • >7 oz/yd2 filter geotextile; <br /> • 1-foot thick granular drainage layer overlapping LCRS trenches with HDPE pipe and coarse <br /> gravel encapsulated in 7-oz/yd2 filter geotextile; <br /> • >12 oz/yd2 cushion geotextile; <br /> • 60-mil thick double-side textured HDPE geomembrane; <br /> • 2-foot thick low permeability clay liner; and • <br /> • Prepared subgrade fill soils. <br /> 2:1/4:1 SIDESLOPES <br /> • 1-foot thick protective operations layer soils (to be placed 10 feet vertically up the slope, <br /> the remaining material will be placed during operations); <br /> • Geocomposite drainage material; <br /> • 60-mil thick single-side textured HDPE geomembrane; <br /> • Geosynthetic clay liner (GCL); and <br /> • Prepared subgrade fill soils. <br /> TOP DECK AREA <br /> • 1-foot thick protective operations layer soils; <br /> • >7 oz/yd2 filter geotextile; <br /> • 6 inches of granular drainage material; <br /> • >12 oz/yd2 cushion geotextile; is <br /> 2 Geo-Logic <br /> A S S 0 C I A T E 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.