Laserfiche WebLink
Geo-Losic <br />A S S 0 C I A T E S <br />CQA DAILY SUMMARY REPORT #007 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel continued monitoring the cleaning work being performed along the synthetic liner tie-in in the <br />north side of FU13. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue buttress fill along the WMU-8 existing slope and the WMU FU13 floor <br />excavation. The Contractor would continue cleaning work along the liner tie-in in the north side of WMU- <br />FU13. The Contractor would continue dust control. <br />Site Visitors: <br />• None. <br />Photos: <br />• <br />Fig.1 Looking South along west side of the buttress fill in WMU-FU13, slope key -in and sheepsfoot <br />compaction. 0 <br />