Laserfiche WebLink
• <br />0 <br />• <br />Geo -Logic <br />ASSOCIATES <br />CQA DAILY SUMMARY REPORT #047 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Meetings and Site Discussions: <br />• Met Kevin (Guinn Superintendent) and Jose Hernandez (Comanco Superintendent) in the morning to discuss <br />planned activity for the work shift. Guinn construction would complete moisture conditioning and smooth <br />drum rolling of top deck subgrade surface area intended for geogrid installation. <br />• Comanco would start installation of the geogrid and the HDPE on the top slope. <br />Site Visitors: <br />• None <br />Photos: <br />PAGE 3OF3 <br />Fig.1 Looking east on east on upper deck area in FU 13; geogrid installation. <br />