Laserfiche WebLink
Geo -Logic <br />ASSOCIATES <br />CQA WEEKLY SUMMARY REPORT <br />FOWARD LANDFILL, WMU FU -13 <br />• CQA personnel performed continuous monitoring of field construction activity insuring conformance with the <br />project CQA plan and design drawings. <br />• CQA personnel performed lab and field testing of buttress fill. <br />• CQA personnel reviewed Skaps Geocomposite MQC certification data submitted by the manufacturer. The <br />MQC data was found to be acceptable and in conformance with the project specifications. <br />The project weekly progress meeting was postponed this week due to the Memorial Holiday. The next <br />weekly project progress meeting will be held on site on June 4th. <br />Weekly Synthetic Liner Quantities: <br />Photo: <br />Fig.1 Looking west, WMU FU -13. <br />PAGE 2 CDF 2' <br />• <br />0 <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />(sf) <br />0 <br />0 <br />0 <br />0 <br />Photo: <br />Fig.1 Looking west, WMU FU -13. <br />PAGE 2 CDF 2' <br />• <br />0 <br />