My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo -Logic <br />A S S 0 C I A T E S <br />FOWARD LANDFILL, WMU FU -13 <br />Location: <br />Manteca, CA Owner: <br />CQA Consultant: <br />Geo -Logic Associates Contractors <br />Prepared by: <br />Jose Armenta (GLA) <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />CQA WEEKLY SUMMARY REPORT #004 <br />Republic Services <br />Guinn Construction <br />Comanco Environmental Corp. <br />Weekly Report No.: 004 Report Period: 06/02-06/09/13 <br />Contractor's Activity <br />Guinn Construction Activities: <br />• The Contractor completed the buttress fill; performed continuous moisture conditioning and compaction <br />during the buttress fill placement. <br />• The Contractor performed floor and slope subgrade finishing in WMU FU -13. <br />• The Contractor excavated the LCRS trenches on subgrade. <br />• • The Contractor started removal of existing sump located at SW corner of the Unit. <br />• The Contractor started stockpiling and processing clay material along the south limits of FU -13. The Clay <br />material is being transferred from the borrow area located approximately 400 ft east of FU -13. <br />• The Contractor performed continuous dust mitigation work during construction activities, using two water <br />trucks. <br />Personnel: 8 <br />Equipment: (1) Excavator, (2) Water Trucks, (5) 637 Cat Scrapers, (3) D6 Cat Dozers, (1) Cat Fork Lift, (1) 966 <br />Cat Loader, (1) 140H Cat Motor -Grader, (1) 825 Cat Sheepsfoot Compactor. <br />Comanco Lining Activities: <br />• None <br />• Comanco Personnel: (0) <br />Equipment: NA <br />• CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of field construction activity insuring conformance with the <br />project CQA plan and design drawings. <br />PAGE 1 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.