Laserfiche WebLink
Geo -Logic <br />A S S 0 C I A T E S <br />CQA WEEKLY SUMMARY REPORT <br />FOWARD LANDFILL, WMU FU -13 <br />• CQA personnel completed lab and field testing of buttress fill. <br />• CQA personnel completed lab clay borrow soil classification testing. <br />• CQA personnel performed review of MQC certification data submitted by the synthetic liner manufacturers. <br />The MQC data submitted to -date was found to be acceptable and in conformance with the project <br />specifications. <br />The project weekly progress meeting was held on site on Tuesday June 4th in the front entrance facility <br />refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />Fig.1 Looking west, WMU-FU13. <br />PAGE 2 OF <br />• <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />(sf) <br />0 <br />0 <br />0 <br />0 <br />Fig.1 Looking west, WMU-FU13. <br />PAGE 2 OF <br />• <br />