Laserfiche WebLink
Geo-LoSiC <br />ASSOC IATES <br />• -_------__--- --- - - <br />FOWARD LANDFILL, WMU FU -13 <br />Location: <br />Manteca, CA Owner: <br />CQA Consultant: <br />Geo -Logic Associates Contractors <br />Prepared by: <br />Jose Armenta (GLA) <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />CQA WEEKLY SUMMARY REPORT #005 <br />Republic Services <br />Guinn Construction <br />Comanco Environmental Corp. <br />Weekly Report No.: 005 Report Period: 06/10-06/16/13 <br />Contractor's Activity <br />Guinn Construction Activities: <br />• The Contractor performed floor and slope subgrade finishing in WMU FU -13. The Contractor used laborers <br />with rakes and shovels on 2:1 slope. <br />• The Contractor performed cleaning work along the North tie-in line with laborers using rakes and shovels to <br />remove soil adjacent to the synthetic liner. <br />• The Contractor completed excavation of the LCRS sumps and trenches on subgrade. <br />• • The Contractor continued stockpiling and processing clay material along the south limits of FU -13. The <br />Contractor started transferring clay material from a borrow site located approximately 600 ft to the east of <br />the Unit. The Contractor removed approximately 6000 cy of top soil to access suitable clay material. <br />• The Contractor performed continuous dust mitigation work during construction activities, used two water <br />trucks. <br />Personnel: 13 <br />Equipment: (1) D8 Cat Dozer, (1) Excavator, (2) Water Trucks, (5) 637 Cat Scrapers, (3) D6 Cat Dozers, (1) Cat <br />Fork Lift, (1) 966 Cat Loader, (1) 140H Cat Motor -Grader, (1) 825 Cat Sheepsfoot Compactor, (1) Tractor w/ <br />disc. <br />Comanco Lining Activities: <br />• None <br />• Comanco Personnel: (0) <br />• Equipment: NA <br />CQA (GLA) Activities: Field Personnel'(1) <br />PAGE 1 OF 2 <br />