Laserfiche WebLink
Geo -Logic <br />ASS0CIATES <br />CQA WEEKLY SUMMARY REPORT <br />FOWARD LANDFILL, WMU FU -13 <br />• CQA personnel performed continuous monitoring of field construction activity insuring conformance with the <br />project CQA plan and design drawings. <br />• CQA personnel performed continuous monitoring of the clay soil processing activities in the stockpile area; <br />continuously monitored clay excavation at the borrow sites insuring continuity of clay soil material; <br />performed lab moisture testing of processed clay material. <br />• CQA personnel continued review of MQC certification data submitted by the synthetic liner manufacturers. <br />The MQC data submitted to -date was found to be acceptable and in conformance with the project <br />specifications. <br />The project weekly progress meeting was held on site on Tuesday June 11th in the front entrance facility; <br />refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />Drain Rock <br />sf) <br />(sf) <br />(sf) <br />(sf) <br />(c <br />Photo: <br />Fig.1 Looking west on east side of clay borrow, moisture conditioning on clay stockpile south of the Cell. <br />PAGE 2 OF21 <br />• <br />