My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-LoqkA S S O C I AT E S <br />CQA WEEKLY SUMMARY REPORT #0 <br />FOWARD LANDFILL, WMU FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geo -Logic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) GLA Project #: 2013-AO55 <br />Weekly Report No.: 010 Report Period: 07/15-07/21/13 <br />Contractor's Activity <br />Guinn Construction Activities: Personnel: 8 <br />• The Contractor completed subgrade preparation along the west and North Slope tie-in. <br />• The Contractor started installation of the perforated LCRS pipe in the east and south collection trenches. <br />• The Contractor transferred the coarse gravel drain rock to the site. <br />• The Contractor transferred approximately 2,000 tons of drainage gravel to the site for the upper deck area. <br />• The Contractor moisture conditioned clay plug material in the clay stockpile located east of the Cell. The <br />Contractor completed placement and compaction of the clay plug except for a small section of anchor trench• <br />being used for access at the east end of the upper deck. <br />• The Contractor completed clearing perimeter of exposed Geocomposite in area located along the SW of FU - <br />13 (FU -08). <br />• The Contractor continued dust control during construction activities. <br />Equipment: (1) 623 Cat paddle wheel Scrapper, (1) Excavator, (2) Water Trucks, (2) 637 Cat Scrapers, (2) LGP <br />D6 Cat Dozers, (1) Cat Fork Lift, (1) 966 Cat Loader, (1) 140H Cat Motor -Grader, (1) Steel Drum Cat smooth <br />roller, (1) Hand Held Compaction Whackers. <br />• Comanco Lining Activities: Personnel: 13 <br />• Comanco completed installation of the single sided Geocomposite in FU -13; completed replacing damaged <br />Geocomposite along the SW tie-in in FU -08. <br />• Comanco continued installation of the 12 -oz cushion geotextile in FU -13. <br />• Comanco completed installation of the geogrid material in FU -13. <br />• Comanco completed installation of the double sided textured liner in FU -13. 0 <br />• Equipment: (2) Fork Lifts, (1) equipment trailer, (1) Van, (3) Trucks. <br />PAGE 1 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.