My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Geo -Logic <br />A S S O C I A T E S V <br />CQA WEEKLY SUMMARY REPORT #010 <br />FOWARD LANDFILL, WMU FU -13 <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of field construction activities insuring <br />conformance with the project CQA plan and design drawings. <br />• CQA personnel performed continuous monitoring of the upper deck soil surface moisture conditioning and <br />finishing work. <br />• CQA performed final walkthrough inspection with Comanco and Guinn construction of soil surface areas <br />prior to the installation of the geogrid and the synthetic liner. CQA performed final walkthrough inspection <br />with Comanco personnel over each of the completed synthetic liner components. <br />• CQA personnel performed field moisture -density testing during clay plug placement. <br />• CQA personnel completed onsite testing of seam destructive samples obtained from HDPE liner production <br />seaming. <br />• CQA personnel completed leak detection testing of HDPE liner on Cell floor. <br />The project weekly progress meeting was held on site on Tuesday July 16th in the front entrance facility; <br />• refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />Geocom osite <br />Drain Rock <br />52,000 (sf) <br />0 (sf) <br />55,596 (sf) <br />235,426 (sf) <br />4, 852 (sf) <br />16 c <br />Photo: <br />• <br />Fig.1 Looking East on FLI-13 north upper deck, Geogrid installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.