My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-LoqkASS0CIATES <br />CQA WEEKLY SUMMARY REPORT#0 <br />--- - -- ---- ---- ----- ._---- - _ . <br />FOWARD LANDFILL, WMU FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geo -Logic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) GLA Project #: 2013-AO55 <br />Weekly Report No.: 011 <br />Contractor's Activity <br />Guinn Construction Activities: Personnel: 8 <br />The Contractor installed LCRS piping and Leachate Tanks. <br />Report Period: 07/22-07/28/13 <br />The Contractor placed the coarse gravel drain rock over the perforated HDPE pipe in the sumps and in the <br />south and east LCRS trenches. <br />The Contractor started installation of the drainage gravel layer in the south half of the Cell floor and in the <br />east half of the 4:1 slope. <br />• The Contractor started installation of the 8 -oz filter fabric over the drain gravel in the south half of the Cell• <br />floor. <br />The Contractor completed installation of the plywood sheeting over the edge of the synthetic liner around <br />the Cell perimeter. <br />The Contractor started placement of the 12 -inch operations soil layer in the south half of the Cell floor. <br />The Contractor completed backfill of the anchor along the east end of the 4:1 slope. <br />• The Contractor continued dust control during construction activities. <br />Equipment: (1) 623 Cat paddle wheel Scrapper, (1) Excavator, (1) Water Trucks, (2) 637 Cat Scrapers, (1) D6N <br />Cat Dozer, (1) D6R Cat LGP Dozer, (1) Cat Fork Lift, (1) 966 Cat Loader, (1) 140H Cat Motor -Grader, (1) Steel <br />Drum Cat smooth roller. <br />• Comanco Lining Activities: Personnel: 4 <br />• Comanco completed installation of the 12 -oz cushion geotextile in FU -13. <br />• Comanco demobilized. <br />GLA <br />CQA Activities: Field Personnel (2) • <br />(GLA) <br />PAGE I OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.