Laserfiche WebLink
C7 <br />4. Field observations, problems, conflicts, and changes: <br />- None <br />5. Issues which impede the construction schedule and corrective measures: <br />- Guinn will contact Lewis Engineering regarding the RFI -01 coarse gravel <br />gradation and pipe slot size. GLA performed the permeability on this gravel <br />material and found it to be acceptable. Once final approval is obtained, Guinn will <br />get the piping and tank perforated. <br />6. Review of submittals and RFI's: <br />- Guinn submitted RF No.1 on smaller slot sizes for the piping and tank. Lewis <br />Engineering will okay pending the grain size and permeability test results. <br />7. Review of CQA activities: <br />- GLA is observing that Guinn is providing adequate moisture to the clay liner to <br />keep it from desiccating. <br />- GLA continues to observe and test the geomembrane and GCL installation on <br />the sideslopes. <br />- GLA tested a sample of the Coarse Gravel and found it to be acceptable. <br />8. Health and safety/Environmental issues: <br />- Guinn/GLA/Republic reported no health and safety issues for the week. <br />- Guinn will continue to provide copies of the weekly tailgate safety meetings to <br />the Forward front office who will make copies and email to Lochlin. <br />- Republic provided copies of the previous health and safety meetings to GLA. <br />Copies have been attached to these meeting minutes. <br />- Guinn/Republic reported no dust control issues. <br />- GLA will continue to provide weekly progress reports and CQA reports to Ross at <br />the RWQCB. <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 3 <br />