Laserfiche WebLink
9. Other items: 0 <br />- Guinn will provide an estimate to conduct the new road into the cell with a gravel <br />surface. <br />- The existing tie-in on the southwest corner has geocomposite that has <br />undergone some degradation in the sun. Comanco, GLA, and Republic went out to <br />this area and determined that the geocomposite needs to be replaced. Following <br />today's meeting; Guinn and Comanco will look at the area and provide costs to <br />replace the material. <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 4 <br />