Laserfiche WebLink
0 <br />PROGRESS MEETING NO. 8 <br />Forward Landfill WMU FU -13 Construction <br />Job No. 2013.AO55 <br />Date: 7-16-13 <br />ATTENDEES: <br />Chris Washa * <br />Comanco <br />775.324.7707 <br />cwashaMomanco.com <br />Scott Harker * <br />Cornanco <br />775.324.7707 <br />sharker(cDcomanco.com <br />Jose Hernandez <br />Comanco <br />714.850.3222 <br />--d—inter Struzyna* <br />Guinn <br />661.327.4562 <br />struzyna (cDea rth mover. com <br />Jeff Affonso <br />Guinn <br />661.325.6109 <br />affon so (a -)-ea rth mover. com <br />Scott Purdy <br />GLA <br />530.272.2448 <br />sPurdy(@-qeo-loqic.com <br />Matt Morrow <br />Guinn <br />661.496.4704 <br />m mo rrow(a-)_earth mover. com <br />Kevin Turner <br />Jose Armenta <br />Guinn <br />GLA <br />661.496.4707 <br />661.444.5663 <br />Ktu rner(a-)-earth mover. com <br />armenta(cDgeo-logic.com <br />Ruben Ramirez <br />Forward <br />209.982.4298 <br />rramirez(a-)-republicservices.com <br />Lochlin Caffey <br />Republic <br />Services <br />925.890.6504 <br />lcaffev2(a)republicservices.com <br />0 Via telephone <br />ACTION ITEMS: <br />- Guinn is planning to seam the geotextile using a lyster with one foot of <br />overlap. GLA contacted Lewis Engineering and this is acceptable. Lewis <br />Engineering also approved placing the geocomposite two feet down into <br />the anchor trench allowing a foot of material to be placed over the <br />geomembrane prior to placement of the geocomposite. <br />- Guinn provided an estimate to conduct the extra work for the access road <br />based on 4,000 yards of soil and a gravel road surface. This was received <br />by Republic and approved. <br />- Guinn provided a revised schedule based on the changes to the <br />geosynthetic installation schedule. Based on the revised schedule, the <br />project should be completed in mid August. <br />