Laserfiche WebLink
L` <br />- GLA observed the placement of the clay plug in the anchor trench. <br />- GLA is conducting conformance testing on the drainage rock. <br />- GLA conducted subgrade acceptance on the top deck prior to geosynthetics <br />placement. <br />- GLA's second monitor will be de-mobing from the site on Friday. <br />8. Health and safety/Environmental issues: <br />- Guinn/GLA/Republic reported no health and safety issues for the week. <br />- Guinn will continue to provide copies of the weekly tailgate safety meetings to <br />the Forward front office who will make copies and email to Lochlin. <br />- Republic provided copies of the previous health and safety meetings to GLA. <br />Copies have been attached to these meeting minutes. <br />- Guinn/Republic reported no dust control issues. <br />- GLA will continue to provide weekly progress reports and CQA reports to Ross at <br />the RWQCB. <br />9. Other items: <br />- The existing tie-in on the southwest corner has geocomposite has undergone <br />some degradation in the sun. Guinn and Comanco provided costs to replace the <br />material. The costs were approved by Republic and the work completed. <br />Additional geotextile was obtained ' • Keller - r used along <br />with left -over geocomposite to complete the cushiongeotextile layer. <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 3 <br />