Laserfiche WebLink
PROGRESS MEETING NO. 10 <br />Forward Landfill WMU FU -13 Construction <br />Job No. 2013.A055 <br />Date: 7-30-13 <br />ATTENDEES: <br />NAME <br />Ruben Rios * <br />FIRM <br />Comanco <br />PHONE <br />775.324.7707 <br />EMAIL <br />rriosllamas(c-comanco.com <br />Ginter Struzyna* <br />Guinn <br />661.327.4562 <br />struzyna(a)earthmover.com <br />Jeff Affonso * <br />Guinn <br />661.325.6109 _ <br />affonso(aDearthmover.com <br />Bryan Fritzler * <br />GLA <br />303.232.3310 <br />bfritzler(cD_geo-logic.com <br />Matt Morrow * <br />Guinn <br />661.496.4704 <br />mmorrow(d�earthmover.com <br />Buck Buxton* <br />RJA <br />925.519.9494 <br />mbuxton(@ria-gps.com <br />Erin Fanning <br />Forward <br />209.227.9531 <br />efanning(aD-republicservices.com <br />Kevin Turner <br />Jose Armenta <br />Lochlin Caffey <br />Guinn <br />GLA <br />Republic <br />Services <br />661.496.4707 <br />661.444.5663 <br />925.890.6504 <br />Kturner earthmover.com <br />jarmenta(a?geo-logic.com <br />Icaffey2(aD-republicservices.com� <br />Via telephone <br />ACTION ITEMS: <br />GLA will contact its Leak Location personnel and inform them that the <br />dipole testing is still on schedule for Tuesday, August 6th <br />1. Comments from previous meeting: <br />- None. <br />2. Review of work progress since previous meeting: <br />- Guinn placed granular drainage material on south half of cell floor. <br />- Guinn placed filter geotextile in the south half of the floor. <br />• - Guinn placed operations layer over approved filter geotextile <br />- Guinn installed 6 -inch perforated HDPE pipe and coarse gravel <br />