My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Guinn backfilled'the east end portion of the anchor trench on 4:1 slope. <br />- Guinn installed the leachate tanks. <br />Comanco completed installation of the cushion geotextile on July 23rd and <br />demobilized on same day. <br />3. Projected schedule: <br />- Guinn will place granular drainage material on the north half of the cell floor and <br />then place the 8 -oz filter geotextile over the drainage material. <br />- Guinn will place operations soil over the filter geotextile to be completed by <br />August Stn <br />- Dipole leak location testing to begin on August 6th <br />- Project completion is estimated to be August 19th <br />4. Field observations, problems, conflicts, and changes: <br />-Guinn pointed out that the leachate tanks received from the manufacturer had <br />the pipe stubs located too high on the tanks. Guinn will contact the manufacturer <br />and have them place new stub outs at the correct elevation on the tanks. <br />(7/30/13 meeting) - stub out were corrected and tank was installed <br />5. Issues which impede the construction schedule and corrective measures: <br />- None <br />6. Review of submittals and RFI's: <br />- No submittals or RFI's are outstanding. <br />7. Review of CQA activities: <br />- GLA is observing Guinn's construction activities. <br />GLA is conducting conformance testing on the drainage rock and observing <br />placement. <br />-GLA is observing placement of the filter geotextile. <br />-GLA is observing the placement of the operations layer. <br />8. Health and safety/Environmental issues: <br />- Guinn/GLA/Republic reported no health and safety issues for the week. <br />- Guinn will continue to provide copies of the weekly tailgate safety meetings to <br />the Forward front office who will make copies and email to Lochlin. <br />- Republic provided copies of the previous health and safety meetings to GLA. <br />Copies have been attached to these meeting minutes. 40 <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.