Laserfiche WebLink
C <br />- Guinn/Republic reported no dust control issues. <br />- GLA will continue to provide weekly progress reports and CQA reports to Ross <br />at the RWQCB. <br />9. Other items: <br />Operations layer was placed over the drainage gravel prior to surveying of the <br />drainage layer for thickness verification. Buck Buxton (surveyor) stated that the <br />survey of the drainage layer was done by probing through the placed operations <br />layer at the pre determined grid points until he was on top of rock and a shot was <br />taken for thickness of the drainage material. Buck will provide verification of the <br />drainage layer thickness. <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 3 <br />