Laserfiche WebLink
PROGRESS MEETING NO. 11 <br />Forward Landfill WMU FU -13 Construction <br />Job No. 2013.A055 <br />Date: 8-6-13 <br />ATTENDEES: <br />Ruben Ramirez <br />FIRM <br />Forward <br />PHONENAME <br />209.982.4298 <br />rramirez ,republicservices.com <br />Scott Purdy <br />GLA <br />530.205.5417 <br />spurdygeo-logic.com <br />Buck Buxton * <br />RJA e <br />925.519.9494 <br />mbuxton(a-)ria-gps.com <br />Erin Fanning <br />Forward <br />209.227.9531 <br />efanning(d,)republicservices.com <br />Kevin Turner <br />Guinn <br />661.496.4707 <br />Kturner(cDearthmover. com <br />Jose Armenta <br />GLA <br />661.444.5663 <br />iarmenta(a�geo-logic.com <br />Lochlin Caffey * <br />Republic <br />Services <br />925.890.6504 <br />Icaffey2(a)republicservices.com <br />• <br />• Via telephone <br />ACTION ITEMS: <br />- GLA will contact its Leak Location personnel and inform them that the <br />dipole testing is still on schedule for Tuesday, August 6th. Leak location <br />personnel are on-site and testing today. <br />- Guinn will contact Republic by the end of today regarding the quantity <br />of geotextile available to complete the top area. <br />1. Comments from previous meeting: <br />- None. <br />2. Review of work progress since previous meeting: <br />- Guinn placed granular drainage material on north half of cell floor. <br />- Guinn placed filter geotextile in the north half of the floor. <br />• - Guinn placed operations layer over approved filter geotextile <br />- Guinn installed 6 -inch perforated HDPE pipe and coarse gravel <br />