My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_4
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-5 <br /> 1.4 Closure Implementation <br /> A closure implementation schedule for the FL will be presented in each Partial FCPCMP as <br /> phased closure is implemented. Closure construction will begin with mobilization of <br /> equipment and materials. The type of equipment and required personnel expected to be <br /> utilized during closure construction includes, but is not limited to, the following: <br /> Equipment <br /> Scrapers <br /> Dozers <br /> Loaders <br /> Compactors <br /> Trucks <br /> — Soil Processing Equipment <br /> Motor Grader <br /> Water Truck <br /> Personnel <br /> — Construction Manager <br /> Field Inspector(s) <br /> Site Engineer(s) <br /> Geotechnical Engineer/Geologist <br /> Geotechnical Technician(s) <br /> Labor Crews <br /> Equipment Operators <br /> Surveyors <br /> Mechanics <br /> Construction Schedule <br /> The start of partial closure construction activities for the FL partial closure and maintenance <br /> areas will commence once refuse fill elevations in that area are achieved. Table 2 presents <br /> the anticipated closure construction period for the maximum extent of the refuse footprint, an <br /> approximate 187-acre closure area. Closure construction activities will include the following <br /> tasks: <br /> ♦ Equipment Mobilization <br /> ♦ Signage <br /> Forward Landfill SWr Engineering <br /> PCPCMP Amendment No.4-May 2013 <br /> z:\projects\allied waste\forward\five year permit rvw 2013\jtd-5 yr pr 2013\appendices\app a-pcpcmp 2013\pcpcmp amend 2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.