My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specified in Section 01410, SURVEYS. <br /> 2. The prepared subgrade surface shall be smooth and free of major irregularities. <br /> The subgrade should contain no exposed particles larger than 3 inches or other <br /> surface irregularities which, in the opinion of the QA/QC CONSULTANT, <br /> will damage the overlying GCL, or 60-mil HDPE geomembrane. <br /> 3. Overexcavation below the established lining subgrade by the EARTHWORK <br /> CONTRACTOR shall, at his expense, be backfilled with Clay Liner Material <br /> or General Earthfill Material as directed by the QA/QC CONSULTANT. <br /> 4. Once completed, all traffic shall be kept off the lining subgrade. <br /> 5. The lining subgrade shall be maintained in the finished condition until the first <br /> succeeding course is placed. Any damage to the prepared lining subgrade by <br /> the EARTHWORK CONTRACTOR shall be repaired, at the EARTHWORK <br /> CONTRACTOR's expense. Any damage to the prepared lining subgrade by <br /> the GEOSYNTHETICS CONTRACTOR, including those caused by a delay <br /> of the GEOSYNHETICS CONTRACTOR, shall be at the <br /> GEOSYNTHETICS CONTRACTOR's expense. <br /> 6. The EARTHWORK CONTRACTOR shall notify the OWNER at least 3 <br /> working days in advance of when the subgrade is completed and ready for as- <br /> built surveys. The OWNER will survey the top of the base and slope subgrade <br /> in accordance with Section 01410, SURVEYS. The survey shall provide <br /> coordinates and elevations of the subgrade surface at a minimum of 75-foot <br /> centers and delineating prominent features. The results of the survey will be <br /> provided to the QA/QC CONSULTANT within 2 days of the survey for <br /> approval prior to placing overlying materials. The QA/QC CONSULTANT <br /> shall have 2 working days to review survey results and may independently <br /> verify survey results. The time taken by the QA/QC CONSULTANT in <br /> checking and verifying the survey results will be considered included in the <br /> total calendar days allotted the EARTHWORK CONTRACTOR before <br /> liquidated damages are assessed. <br /> B. After completion of clay liner and subgrade fill,proof-roll the surface of the entire <br /> lined area with a loaded dump truck or similar heavy-wheeled equipment to detect <br /> soft or loose zones. Notify the QA/QC CONSULTANT prior to commencement <br /> of proof-rolling. If soft or loose zones are found, excavate the soft or loose <br /> material to a depth accepted by the QA/QC CONSULTANT, then fill with Clay <br /> Liner or General Earthfill, as appropriate. The Clay Liner or General Earthfill <br /> shall be compacted as specified for such fill. <br /> 3.9 CONSTRUCTION OF CLAY LINER <br /> A. General: <br /> I. Clay Liner Material shall be processed to meet the requirements of Article <br /> 2.4 of this Specification. The EARTHWORK CONTRACTOR may request <br /> ® information from the OWNER on successful processing and placement <br /> procedures used for the construction of previous WMUs at the Forward <br /> Landfill. The EARTHWORK CONTRACTOR shall have the option to <br /> determine construction procedures to be used, subject to the approval and <br /> Forward Landfill WMU FU-13 <br /> 02300 13 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.