My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_8
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_8
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_8
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_8.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manager will review all acceptance test results and report an non-conformance to the <br /> The QA/QC g p p Y <br /> Construction Manager and Contractor. <br /> Sampling Procedures. Samples will be taken across the entire width of the roll. Unless otherwise <br /> specified, samples will be 3 ft(1 m) long by the roll width. The QA/QC Consultant will mark the <br /> machine direction on the samples with an arrow. <br /> Test Results.The QA/QC Consultant will examine all results from laboratory acceptance testing and <br /> will report any nonconformance to the Construction Manager. <br /> Acceptance Test Failure. If a Geotextile acceptance sample does not comply with the minimum <br /> requirements of the Specifications, the Geotextile roll from which the sample was taken will be <br /> failed by the QA/QC Consultant,and replaced by the Geotextile Manufacturer at no additional cost <br /> to the Owner. The Design Engineer shall be contacted to determine additional acceptance testing <br /> requirements. <br /> 4.3.3 Geotextile Installation <br /> Surface Preparation. Before geotextile installation,the QA/QC Inspector will: <br /> • Verify that all lines and gradese have been verified by the Contractor. <br /> • Verify that all seaming and-required testing of the HDPE geomembrane underlying the <br /> cushion geotextile has been completed. <br /> • Verify that the granular drainage material underlying the filter geotextile has been placed <br /> to the required thickness. <br /> Geotextile Placement and Seaming. During geotextile placement and seaming operations, the <br /> QA/QC Inspector will: <br /> • Observe the geotextile as it is deployed and record all defects and defect corrective <br /> actions(panel rejected,patch installed,etc.). Verify that corrective actions are performed <br /> in accordance with the specifications. <br /> • Verify that equipment used does not damage the geotextile by handling, equipment <br /> transit, leakage of hydrocarbons, or other means. <br /> • Verify that crews working on the geotextile do not smoke,wear shoes that could damage <br /> the geotextile, or engage in activities that could damage the geotextile. <br /> • Verify that adjacent panels are overlapped or seamed in accordance with the <br /> Page 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.