Laserfiche WebLink
® Specifications. <br /> • Verify that the geotextile was not exposed to direct sunlight for more than 5 days. <br /> • Examine the geotextile after installation to ensure that no potentially harmful foreign <br /> objects are present. <br /> The QA/QC Inspector must inform both the QA/QC Manager and Earthwork Contractor if the above <br /> conditions are not met. <br /> 4.3.4 Repairs <br /> Repair procedures include: <br /> • Patching--used to repair large holes,tears, and small defective areas. <br /> • Removal--used to replace large defective areas where the preceding method is not <br /> appropriate. <br /> 4.4 Geocomposite Drainage Net <br /> AMIL 4.4.1 Delivery <br /> During delivery of geocompositee-material the QA/QC Inspector will: <br /> • Verify that equipment used to unload the rolls will not damage the geocomposite. <br /> • Verify that care is used to unload the rolls. <br /> • Verify that all documentation required by the Specifications has been received. <br /> • Verify that each roll is marked or tagged with the following information:manufacturer's <br /> name; project identification; lot number; roll number; roll dimensions. Log this <br /> information on the geosynthetic receipt form. <br /> • Verify that the geosynthetic receipt form is completed. <br /> • Verify that materials are stored in a location that will protect the rolls from ultraviolet <br /> light exposure,precipitation,mud,dirt,dust,puncture,cutting,or any other damaging or <br /> deleterious conditions. <br /> • Any damaged rolls may be rejected.Verify that rejected material is removed from the site <br /> or are stored at a location separate from accepted rolls. Geocomposite rolls that do not <br /> • <br /> Page 39 <br />